Commercial restoration is typically priced from line items for labor, equipment days, materials and disposal, often in an estimating platform that insurers recognize. The totals depend less on the size of the wet area than on how hard it is to work there, what got wet, and how long equipment has to run. Downtown buildings add their own factors: vertical access, security, building rules and tight streets.

Factors and how they affect scope

Factor
Response time to start mitigation
Tends to increase scope when
Water sits overnight or over a weekend
Tends to reduce scope when
Extraction starts promptly
Factor
Water category
Tends to increase scope when
Drain, sewer or long-standing water
Tends to reduce scope when
Clean supply or quickly extracted sprinkler water
Factor
Materials affected
Tends to increase scope when
Insulation, plaster, hardwood, custom millwork
Tends to reduce scope when
Concrete, sealed surfaces, carpet tile on releasable adhesive
Factor
Access
Tends to increase scope when
Upper floors, small passenger-only elevators, limited dock time
Tends to reduce scope when
Freight elevator and dock reserved for the job
Factor
Work hours
Tends to increase scope when
Noisy work restricted to nights and weekends
Tends to reduce scope when
Work allowed during the day
Factor
Containment
Tends to increase scope when
Occupied adjacent suites need dust control and negative air
Tends to reduce scope when
Whole floor vacant
Factor
Testing
Tends to increase scope when
Older building materials need sampling before demolition
Tends to reduce scope when
Existing survey covers the affected materials
Factor
Electrical and power
Tends to increase scope when
Temporary power or generators needed
Tends to reduce scope when
Building circuits can carry equipment loads
Factor
Documentation
Tends to increase scope when
Multiple tenants and carriers need split records
Tends to reduce scope when
Single owner-occupant

Choices that change the total

  • IfTenants want work done only after hoursThenExpect added labor cost; weigh it against tenant disruption and business interruption.
  • IfAn owner prefers to dry rather than replace finishesThenDrying may cost less in materials but more in monitoring days; agree on a point at which replacement takes over.
  • IfA tenant asks for upgrades during rebuildThenSeparate the upgrade cost from the insured repair in writing.
  • IfThe building has no pre-loss recordsThenMore time may be spent locating shutoffs, drawings and tenant contacts, which adds cost.

Questions for any estimate

  1. How many equipment days are assumed for each area, and what would shorten that?
  2. Which items are emergency mitigation and which are reconstruction?
  3. What disposal and hauling assumptions are included for a downtown site?
  4. Are any costs tied to building rules, such as security escorts or elevator operators?

Common questions

Why are equipment days such a large part of commercial estimates?

Large floors can need dozens of dehumidifiers and air movers. Each additional day of drying adds to the bill, so early extraction and removing materials that will not dry often shorten the job overall.

General information for Downtown Denver, not a quote or professional advice. In an emergency, call 911.